Post-Strike Recovery in Odesa: Power Restored Partially, Buses Replace Electric Transit Giant solar power plant built near the Sahara generates electricity even at night Destruction of Russian Corvette Near Libya: Ukrainian Navy Explains Significance Kherson region and Ukraine face incoming bad weather with snow and squall winds Signal Introduces Anti-AI Measures on iOS and Android to Protect Chats Western intelligence warns of Russian plans to deploy nuclear weapons in space Usyk changes sports on London basketball court and challenges NBA legend to a fight Constitutional Court of Ukraine on the brink of losing quorum Russian Ministry of Energy Announces Additional Equipment Supplies to Occupied Kherson Region Expansion of Defense Forces' Capabilities Allows Operations in New Directions, Expert Says Post-Strike Recovery in Odesa: Power Restored Partially, Buses Replace Electric Transit Giant solar power plant built near the Sahara generates electricity even at night Destruction of Russian Corvette Near Libya: Ukrainian Navy Explains Significance Kherson region and Ukraine face incoming bad weather with snow and squall winds Signal Introduces Anti-AI Measures on iOS and Android to Protect Chats Western intelligence warns of Russian plans to deploy nuclear weapons in space Usyk changes sports on London basketball court and challenges NBA legend to a fight Constitutional Court of Ukraine on the brink of losing quorum Russian Ministry of Energy Announces Additional Equipment Supplies to Occupied Kherson Region Expansion of Defense Forces' Capabilities Allows Operations in New Directions, Expert Says

Kherson's Luchansky Hospital loses 4 million UAH lawsuit against contractor

🏛️ Politics 2 min read 👁 0

A commercial court denied the medical facility's claim to recover funds for shelter renovations, citing the acceptance of work without objections.

Kherson's Luchansky Hospital loses 4 million UAH lawsuit against contractor🏛️Politics

Photo: intent.press

Key points

  • Luchansky Hospital lost a 3.86 million UAH claim
  • Court ruled that signed acceptance certificates are final
  • State Audit Service findings were insufficient to overturn the payments
  • Client responsibility for inspection during work acceptance is paramount

Kherson City Clinical Hospital named after O.S. Luchansky has failed to recover over 3.86 million UAH from the contractor LLC "Alsvit Plus". The Commercial Court of Poltava Region dismissed the medical facility's lawsuit, ruling against the hospital's claims of overpayment.

The dispute and court ruling

The conflict centered on a contract for the reconstruction of a shelter and operating unit signed in the spring of 2024. During the construction process, the parties adjusted the contract terms multiple times. Following the completion of the work, the State Audit Service conducted an inspection, which concluded that there were discrepancies in work volumes and inflated costs for materials.

However, the court sided with the contractor. The key factor was that the hospital had signed the work acceptance certificates without any objections and had paid for the services in full. The court emphasized that the client is responsible for verifying the quality and volume of work during the acceptance phase, and cannot retroactively demand a refund after the financial settlement has been completed.

Rejection of expert analysis

Furthermore, the court denied the hospital's request to appoint additional construction-technical and economic expert examinations. The court also refused to involve the Kherson City Military Administration in the case, noting that the hospital acts as an independent legal entity responsible for its own contractual obligations.

Source intent.press — intent.press/news/localgovernment/2026/khersonska-likarnia-prograla-pid… ↗